Rough-In Permanent Service | 4/5/2004 | 4/5/2004 | 4/5/2004 | P | PASS |
Joe Ray
|
|
|
Joe, we are finished with this work now and are ready for you to inspect. PLEASE call Fletcher (customer) at ###-#### with 15 to 20 minutes notice to meet you. Thanks !!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
Rough-In Permanent Service | 3/31/2004 | 4/1/2004 | 4/1/2004 | P | PASS |
Joe Ray
|
|
|
1)Replace the existing 100amp service with 200 amp service meterbase.PLEASE notify Idaho Power when you have inspected the lowered meterbase so they will re-energize the service today!!!
2)re-routed the existing ckt. that is now feeding the new shop building (from the indoor house panel to the existing underground PVC and wires going out to the new shop).The rest of the existing wiring to the shop and inside the shop was done by others!!!
Mitchell electric is reachable at ###-#### Spencer
Please call Fletcher(customer) @ ###-####, &/or @ ###-#### with a 20 minute notice for access indoors. Thanks!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell p/s ug r ok 4/1/2004 1:56:55 PM
|