Permanent Service | 4/12/2004 | 4/13/2004 | 4/13/2004 | A | PASS |
Joe Ray
|
|
|
###-#### Allan p/s ug n ok 4/13/2004 10:16:43 AM
|
Permanent Service | 4/2/2004 | 4/5/2004 | 4/5/2004 | A | FAIL |
Joe Ray
|
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore grd rods not 6 ft apart/no trench inspection 4/5/2004 9:27:06 AM
|
Final | 4/1/2004 | 4/2/2004 | 4/2/2004 | A | FAIL |
Jack Frank
|
|
|
###-#### called could not locate electrodes or see where piping was grounded or bonded contractor back filled it and covered it up whole job still needs inspection 4/2/2004 12:00:44 PM
|