Final | 4/27/2004 | 4/29/2004 | 4/29/2004 | A | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/27/2004 at 2:01:39 PM. Contact: ###-####. they to call for final after they tie an ele to new bld 4/29/2004 10:26:11 AM
|
Final | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/29/2004 at 10:32:03 AM. Contact: ###-####. ok final 4/29/2004 3:48:23 PM
|
Electrical Rough-In | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/6/2004 at 2:03:56 PM. Contact: ###-####. walls and ceiling 2rooms met with Eric 4/7/2004 9:03:41 AM
|