Electrical Rough-In | 8/16/2005 | 8/16/2005 | 8/16/2005 | P | PASS |
Pat Lass
|
|
|
###-#### - herb
|
Permanent Service | 8/16/2005 | 8/16/2005 | 8/16/2005 | P | PASS |
Pat Lass
|
|
|
###-#### - herb P/S U/G N Ok
|
Electrical Rough-In | 8/15/2005 | 8/15/2005 | 8/15/2005 | P | FAIL |
Pat Lass
|
|
|
###-#### herb Gec to go to neutral replace broken boxes and rewire hood fan from a different circuit
|
Rough-In Permanent Service | 7/7/2005 | 7/8/2005 | 7/11/2005 | A | CANC |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 7/7/2005 at 1:22:03 PM. Contact: ###-####.
|
Electrical Rough-In | 7/8/2005 | 7/8/2005 | 7/8/2005 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 7/7/2005 at 1:22:03 PM. Contact: ###-####. ok to cover with concrete
|
Electrical Rough-In | 7/8/2005 | 7/8/2005 | 7/8/2005 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 7/7/2005 at 1:22:03 PM. Contact: ###-####. ok to cover ufer
|
Rough-In Permanent Service | 7/6/2005 | 7/7/2005 | 7/7/2005 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/6/2005 at 11:49:55 AM. Contact: ###-####. owner planning changes to building, see ri
|
Electrical Rough-In | 7/7/2005 | 7/7/2005 | 7/7/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/6/2005 at 11:49:55 AM. Contact: ###-####. ok to pour gec
|
Electrical Rough-In | 4/28/2005 | 5/2/2005 | 5/2/2005 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/28/2005 at 12:29:29 PM. Contact: ###-####.
had conf. 5/2/2005 9:29:26 AM
|