Electrical Rough-In | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | PASS |
Mike Kinnear
|
|
|
Doug; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok cover ri 4/22/2004 11:07:45 AM
|
Electrical Rough-In | 4/20/2004 | 4/21/2004 | 4/21/2004 | P | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/20/2004 at 3:00:29 PM. Contact: ###-####. general contractor did not open all the area what i did see was not stapled correctly also make up not done in outlet boxes the electricain to meet with us tomorrow. he is out of buhl, idaho 4/21/2004 1:21:28 PM
|
Electrical Rough-In | 4/20/2004 | 4/20/2004 | 4/20/2004 | P | FAIL |
Mike Kinnear
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore called electrical contractor he had general contractor call. they cover the wiring before inspection. they to open it up so we can inspect the ri 4/20/2004 12:35:23 PM
|