Electrical Rough-In | 6/3/2004 | 6/4/2004 | 6/4/2004 | A | PASS |
Pat Lass
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Electrical Rough-In | 6/2/2004 | 6/3/2004 | 6/3/2004 | A | FAIL |
Pat Lass
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
corrections not made must pour concrete over PVC instal new panelboard and eliminate induction problems. 6/3/2004 9:06:06 AM
|
Final | 6/1/2004 | 6/1/2004 | 6/1/2004 | P | FAIL |
Jack Frank
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs neutral kit for disconnect used as sevice equip, uncover trench, needs #8 or larger GEC at pole sevice terminate grd and neutral toether at pole service, sign company needs permit, and shall meet NEC 600.(5)(C)(3)&410.15(B)(2) 6/1/2004 1:18:46 PM
|