Final | 7/14/2004 | 7/15/2004 | 7/15/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/14/2004 at 7:35:22 PM. Contact: ###-####.
|
Electrical Rough-In | 5/10/2004 | 5/11/2004 | 5/11/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 5/10/2004 at 7:02:37 PM. Contact: ###-####. p/s ug n ok 5/11/2004 9:11:02 AM
|