Final | 11/9/2004 | 11/10/2004 | 11/10/2004 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/9/2004 at 9:47:10 AM. Contact: ###-####.
|
ELE-Aging Inspection | 11/2/2004 | 11/2/2004 | 11/2/2004 | | PART |
Pat Lass
|
|
|
will call for inspection 11/4/2004 3:28:05 PM
|
Final | 7/22/2004 | 7/23/2004 | 7/23/2004 | A | PART |
Pat Lass
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
signed T/O
automatic curtains with cords above ceiling not permitted check listing 7/23/2004 9:21:46 AM
|
Final | 7/16/2004 | 7/19/2004 | 7/19/2004 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/16/2004 at 3:15:08 PM.
all but the teaming room ok 7/19/2004 8:39:36 AM
|
Final | 7/13/2004 | 7/14/2004 | 7/14/2004 | P | NR |
Pat Lass
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ceiling in 1 room left and listing info on mfg wireing 7/14/2004 2:50:12 PM
|
Electrical Rough-In | 7/12/2004 | 7/13/2004 | 7/13/2004 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/12/2004 at 11:35:07 AM. Contact: ###-####.
wrong support of boxes 7/13/2004 10:42:40 AM
|
Electrical Rough-In | 6/30/2004 | 7/1/2004 | 7/1/2004 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 6/30/2004 at 3:27:49 PM. Contact: ###-####.
Anop 7/1/2004 9:35:41 AM
|
Electrical Rough-In | 5/18/2004 | 5/19/2004 | 5/19/2004 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/18/2004 at 2:34:23 PM. Contact: ###-####.
hard lids ok 5/19/2004 4:10:05 PM
|
Electrical Rough-In | 5/14/2004 | 5/17/2004 | 5/17/2004 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/14/2004 at 12:03:21 PM. Contact: ###-####.
walls ok 5/17/2004 11:04:39 AM
|
Electrical Rough-In | 5/4/2004 | 5/5/2004 | 5/5/2004 | A | PART |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 5/4/2004 at 3:27:48 PM. Contact: ###-####. 5/5/2004 7:45:43 AM
walls except for teaming room area ok 5/5/2004 10:45:23 AM
|