ELE-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | DONE |
Joe Ray
|
|
|
|
ELE-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | DONE |
Joe Ray
|
|
|
|
Electrical Rough-In | 5/24/2004 | 5/24/2004 | 5/24/2004 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 5/24/2004 at 7:41:03 AM. Contact: ###-####.
|
Electrical Rough-In | 5/24/2004 | 5/24/2004 | 5/24/2004 | A | PASS |
Joe Ray
|
|
|
ceiling 5/24/2004 9:10:35 AM ceiling ok fo cover 5/24/2004 9:20:07 AM
|
Final | 5/24/2004 | 5/24/2004 | 5/24/2004 | P | PASS |
Joe Ray
|
|
|
Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH
|
Electrical Rough-In | 5/12/2004 | 5/13/2004 | 5/13/2004 | A | FAIL |
Pat Lass
|
|
|
###-#### READY FOR INTERIOR WALL ROUGH-IN OF NEW ELECTRICAL INSTALLATION.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH 5/13/2004 7:37:23 AM
Protection and support om mc cable all over 5/13/2004 8:40:55 AM
|
Electrical Rough-In | 5/13/2004 | 5/13/2004 | 5/13/2004 | P | PASS |
Joe Ray
|
|
|
REINSPECT RUFF-IN; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH
|