Final | 7/21/2004 | 7/22/2004 | 7/22/2004 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/21/2004 at 3:22:24 PM. Contact: ###-####.
|
Electrical Rough-In | 6/1/2004 | 6/2/2004 | 6/2/2004 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 6/1/2004 at 3:35:14 PM. Contact: ###-####.
R/I Ok 6/2/2004 10:03:38 AM
|
Electrical Rough-In | 5/25/2004 | 5/26/2004 | 5/26/2004 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/25/2004 at 6:53:20 PM. Contact: ###-####.
kitchen bath and laundry room ok 5/26/2004 3:37:08 PM
|
Conference | 5/20/2004 | 5/21/2004 | 5/21/2004 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 7:00:14 AM.
talked about 50% ruleand knob and tube 5/21/2004 11:01:48 AM
|