Final | 5/26/2004 | 5/26/2004 | 5/26/2004 | P | PASS |
Jack Frank
|
|
|
Howdy Jack, your corrections are now completed & ready for re-inspection. Thanks!!! Dan.; Phone #: ###-#### ok 5/26/2004 1:30:58 PM
|
Rough-In Permanent Service | 5/21/2004 | 5/21/2004 | 5/21/2004 | P | FAIL |
Jack Frank
|
|
|
We ran 3 new 20 amp 120 volt circuits up to the roof, then wired them into the new signs and new neon lighting on the building. We installed 2 new contactors which are controled by an existing photocell, to control our 3 new circuits. Roof access is via a wall mounted ladder in the shop area. Thanks!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell cor. posted called support bell box on roof also needs bushin for rigid nipple shall noe ID 6 or smaller neutral contactor jbox also tie grds together and grd box install gasket bell box on foof seal all unused openongs 5/21/2004 2:39:22 PM
|