Final | 7/19/2004 | 7/19/2004 | 7/19/2004 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/19/2004 at 7:36:21 AM. Contact: ###-####.
|
Electrical Rough-In | 6/10/2004 | 6/10/2004 | 6/10/2004 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 6/10/2004 at 7:31:01 AM. Contact: ###-####.
R/I Ok
6/10/2004 1:46:34 PM
|
Permanent Service | 6/10/2004 | 6/10/2004 | 6/10/2004 | P | PASS |
Pat Lass
|
|
|
P/S O/H N Ok
|
Rough-In Permanent Service | 6/2/2004 | 6/7/2004 | 6/7/2004 | A | CANC |
Pat Lass
|
|
|
Darrell ###-####
|