Final | 6/24/2005 | 6/27/2005 | 6/27/2005 | A | PASS |
Pat Lass
|
|
|
i thought i already did this; Phone #: ###-#### Internet Inspection Request from: dennis mcneely no card
|
Electrical Rough-In | 4/29/2005 | 4/29/2005 | 4/29/2005 | P | PASS |
Pat Lass
|
|
|
###-#### correction inspect for ceiling cover entry to bank ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely 4/29/2005 7:51:43 AM
|
Electrical Rough-In | 4/26/2005 | 4/26/2005 | 4/26/2005 | A | FAIL |
Pat Lass
|
|
|
###-#### would like ceiling cover for front entry lobby, area leading to entry door of ICCU-No one will be there from DL but a Gorringe Bro. rep. should be, check it out, anytime today is ok. should be ready, but you know me, the N. ###-#### entry doors are going to change to a keyless lock controled from inside the bank,thats why LV wires are hanging by door. pick-up the phone give me a call if you have questions or need somthing done. thanks ; Phone #: ###-#### Internet Inspection 4/26/2005 7:48:54 AM
support box and raceway
change wires to recessed cans to branch circuit type installation. not fixture whips
4/26/2005 9:45:44 AM
|
Electrical Rough-In | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | PASS |
Pat Lass
|
|
|
need ceiling cover in basement break rm area , hall to men room & shower room ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely
|
Rough-In Permanent Service | 2/23/2005 | 2/23/2005 | 2/23/2005 | P | PART |
William E Thomas
|
|
|
ceiling cover basement area- from elevator lobby to entry & small hallway in front of service elevator. ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely
bathroom cieling ok, entryway hallway to elevator west ok. 2/23/2005 2:35:43 PM
|
Electrical Rough-In | 2/15/2005 | 2/15/2005 | 2/15/2005 | P | PART |
Pat Lass
|
|
|
wall cover inspection pleasein the basement breakroom area////dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Electrical Rough-In | 2/1/2005 | 2/1/2005 | 2/1/2005 | A | PART |
Pat Lass
|
|
|
basement restrooms-need cover inspection on walls ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely
|
Final | 1/14/2005 | 1/14/2005 | 1/14/2005 | A | NR |
Pat Lass
|
|
|
first floor restroom & exit hallway, have two lights to do will be done by 10 am ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely
|
Final | 1/14/2005 | 1/14/2005 | 1/14/2005 | P | NR |
Pat Lass
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ceiling R/I Ok
1st floor bathrooms and hall 1/14/2005 3:37:12 PM
|
Electrical Rough-In | 12/9/2004 | 12/9/2004 | 12/9/2004 | P | PART |
Pat Lass
|
|
|
###-#### 1st floor restrooms - adding switches & plugs need cover- access thru entry to bank use one of two doors on right to get to employee restroom or call me. ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely 12/9/2004 1:04:31 PM
|
Electrical Rough-In | 12/2/2004 | 12/2/2004 | 12/2/2004 | A | PASS |
Pat Lass
|
|
|
2nd flr offices - ceiling cover - have finished all hole pluggging & cable strappping DL ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely
|
Rough-In Permanent Service | 12/1/2004 | 12/1/2004 | 12/1/2004 | P | NR |
Pat Lass
|
|
|
###-#### dennis - Note: ceiling cover - 2nd floor off; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 12/1/2004 11:46:11 AM
|
Electrical Rough-In | 11/17/2004 | 11/18/2004 | 11/18/2004 | A | PART |
Pat Lass
|
|
|
second floor - cover ceilings hallway & restroom; Phone #: ###-#### Internet Inspection Request from: dennis mcneely
2nd floor ok 11/18/2004 9:19:13 AM
|
Electrical Rough-In | 11/3/2004 | 11/3/2004 | 11/3/2004 | P | PART |
Pat Lass
|
|
|
###-#### second floor - bathroom walls & new wall for office in hallway ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely 11/3/2004 11:40:18 AM
|
Electrical Rough-In | 10/14/2004 | 10/15/2004 | 10/15/2004 | A | PASS |
William E Thomas
|
|
|
3rd floor ceiling\\###-####
CIELING OK TO COVER
10/15/2004 11:22:02 AM
|
Electrical Rough-In | 10/14/2004 | 10/14/2004 | 10/14/2004 | P | NR |
Pat Lass
|
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
3rd floor hall not ready 10/14/2004 2:33:00 PM
|
Electrical Rough-In | 10/1/2004 | 10/1/2004 | 10/1/2004 | P | PART |
Pat Lass
|
|
|
3rd fl bathroom for cover please//dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
walls ok 10/1/2004 2:50:06 PM
|
Conference | 8/30/2004 | 8/30/2004 | 8/30/2004 | P | PART |
Pat Lass
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
talked about 110.26 working and dedicated space 8/30/2004 1:19:21 PM
|
ELE-Aging Inspection | 8/9/2004 | 8/9/2004 | 8/9/2004 | | NR |
Pat Lass
|
|
|
SUC 8/12/2004 11:43:06 AM
|
Electrical Rough-In | 6/7/2004 | 6/7/2004 | 6/7/2004 | P | PASS |
Pat Lass
|
|
|
dennis ###-####
u/G ok 6/7/2004 4:30:57 PM
|