Final | 7/7/2004 | 7/7/2004 | 7/7/2004 | A | PASS |
William E Thomas
|
|
|
final ok
|
Rough-In Permanent Service | 7/6/2004 | 7/7/2004 | 7/7/2004 | A | PASS |
William E Thomas
|
|
|
The 3 Pot holes are dug for you, shop panel access through big shop door. Thanks!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
corrections ok 7/7/2004 8:36:38 AM
|
Rough-In Permanent Service | 7/6/2004 | 7/6/2004 | 7/6/2004 | P | FAIL |
William E Thomas
|
|
|
We installed a new 100 amp 4 wire underground circuit in pvc pipe @ the proper depth to the existing shop building, relocated the shop panel and re-fed the existing circuits from the panel's new location. Drove 1 ground rod at shop. Customer requests inspection AFTER 2:00 PM today. Thanks!!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
no burial inspection, no access to the sub panel 7/6/2004 12:03:13 PM
|
Permanent Service | 6/16/2004 | 6/16/2004 | 6/16/2004 | P | PASS |
Jack Frank
|
|
|
p/s u/g rec. ok
|
Rough-In Permanent Service | 6/14/2004 | 6/16/2004 | 6/16/2004 | P | PART |
Jack Frank
|
|
|
We're upgrading the service to 200 amps, and wiring a hot tub.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell see added p/s r/i not ready old conduit feeding out building not approved needs proper depth, shall not be within 5 ft of spa , no violations to be retained 6/16/2004 12:51:12 PM
|