Final | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/12/2004 at 8:34:07 AM. Contact: ###-####. ok card signed 11/12/2004 3:28:13 PM
|
Rough-In Permanent Service | 7/30/2004 | 7/30/2004 | 7/30/2004 | A | PASS |
Jack Frank
|
|
|
r/i ok p/s u/g new ok
|
Permanent Service | 7/27/2004 | 7/27/2004 | 7/27/2004 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/27/2004 at 7:37:50 AM. Contact: ###-####. mark spaces at meterbase, grd wire shall terminate at neutral bus called
7/27/2004 2:05:59 PM
|
Electrical Rough-In | 6/21/2004 | 6/21/2004 | 6/21/2004 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/21/2004 at 7:51:46 AM. Contact: ###-####. outside soffits only 6/21/2004 2:25:24 PM
|