Final | 2/4/2005 | 2/7/2005 | 2/7/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 11:50:58 AM. Contact: ###-####. corrections made, ok to final 2/7/2005 8:09:05 AM
|
Final | 2/3/2005 | 2/3/2005 | 2/3/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/3/2005 at 7:58:15 AM. Contact: ###-####. 350.30(A) liquid-tite shall be supported within 3' of box, 358.30 emt shall be strapped within 3' of box, 358.26 there shall not be more than 360 degree in conduit bends, 110.12(A) unused openings shall be closed in panel, 408.4 Panels shall have circuit directory, 110.13(A) equipment (recpts) shall be secured to surface. Called contr and left correction notice. 2/3/2005 2:38:34 PM
|
Electrical Rough-In | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 12:38:13 PM. Contact: ###-####. walls old part S W corner 1/7/2005 10:20:01 AM
|
Electrical Rough-In | 12/10/2004 | 12/13/2004 | 12/13/2004 | A | PASS |
Bob Reichert
|
|
|
Harold; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to cover main hall and classrooms 12/13/2004 9:33:00 AM
|
Rough-In Permanent Service | 11/17/2004 | 11/18/2004 | 11/18/2004 | A | PART |
Pat Lass
|
|
|
harold Note: above ceiling ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ceiling inspection ok no svc yet 11/18/2004 10:49:25 AM
|
Rough-In Permanent Service | 9/9/2004 | 9/10/2004 | 9/10/2004 | P | PART |
Pat Lass
|
|
|
addition in n.east corner will be ready for walls only rough-in inspection; Phone #: ###-#### Internet Inspection Request from: Harold Machado
walls ok 9/10/2004 2:49:07 PM
|
Electrical Rough-In | 8/26/2004 | 8/27/2004 | 8/27/2004 | A | PART |
William E Thomas
|
|
|
harold; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
classroom remodel area 8/27/2004 9:29:48 AM
|