Final | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 8:29:05 PM. Contact: ###-####.
|
Final | 7/20/2004 | 7/20/2004 | 7/20/2004 | P | NR |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/20/2004 at 9:46:02 AM. Contact: ###-####.
|
Electrical Rough-In | 7/14/2004 | 7/14/2004 | 7/14/2004 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/14/2004 at 9:12:51 AM. Contact: ###-####. r/i walls only 7/14/2004 3:14:33 PM
|