Final | 9/10/2004 | 9/13/2004 | 9/13/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/10/2004 at 12:34:30 PM. Contact: ###-####.
|
Electrical Rough-In | 9/8/2004 | 9/9/2004 | 9/9/2004 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/8/2004 at 4:29:53 PM. Contact: ###-####.
|
Electrical Rough-In | 9/1/2004 | 9/2/2004 | 9/2/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/1/2004 at 3:44:53 PM. Contact: ###-####. part. r/i ceiling and walls ok 9/2/2004 10:22:01 AM
|
Electrical Rough-In | 8/6/2004 | 8/9/2004 | 8/9/2004 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/6/2004 at 4:06:23 PM. Contact: ###-####. west wall, and front entry ceiling area 8/9/2004 10:39:28 AM
|
Electrical Rough-In | 8/4/2004 | 8/5/2004 | 8/5/2004 | A | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 10:40:01 AM. Contact: ###-####.
ri ok walls and soffit from rear of space to halfway to front 8/5/2004 9:48:45 AM
|