Final | 9/27/2004 | 9/27/2004 | 9/27/2004 | A | PASS |
Jack Frank
|
|
|
job taken over by different contractor
|
Electrical Rough-In | 8/13/2004 | 8/13/2004 | 8/13/2004 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/13/2004 at 7:57:15 AM. Contact: ###-####. u/g ok 8/13/2004 1:27:19 PM
|
Electrical Rough-In | 8/11/2004 | 8/12/2004 | 8/12/2004 | P | PART |
Jack Frank
|
|
|
jerry ann; Phone #: ###-#### Internet Inspection Request from: Annette Moore pool light and under ground conduit kevin ###-#### part u/g only u/g to pool lights ok and 2 runs to bottom of hill ok over 360 degrees on other u/g called 8/12/2004 2:53:24 PM
|
Electrical Rough-In | 8/3/2004 | 8/5/2004 | 8/5/2004 | P | PART |
Jack Frank
|
|
|
###-#### kevin pool bonding at pool only no u/g ready yet 8/5/2004 2:04:37 PM
|