Final | 12/20/2005 | 12/22/2005 | 12/22/2005 | A | PASS |
Pat Lass
|
|
|
Please call Steve at ###-#### prior to inspection to arrange for access. Internet Inspection Request from: Steve Craig
|
Final | 12/19/2005 | 12/19/2005 | 12/19/2005 | P | NR |
Pat Lass
|
|
|
###-#### - STEVE nOTE: PLEASE CALL 1/2 HR TO GET IN HOUSE still had no access to top floor 3rd party testing required for heater in garage.
|
Final | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | NR |
Pat Lass
|
|
|
Please call Mike Reynolds at ###-#### to arrange access to the home proir to inspection. Internet Inspection Request from: Steve Craig still had no access to top floor and speakers not yet installed by hot tub. 3rd party testing required for heater in garage. install receps on counter by kitchen. extend platform in front of panel. Install cap on outside wall.
|
Final | 12/5/2005 | 12/6/2005 | 12/6/2005 | A | NR |
Mike Kinnear
|
|
|
Please call Mike Reynolds prior to inspection to arrange access to home. Internet Inspection Request from: Steve Craig conf with electrician
|
Final | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | NR |
Pat Lass
|
|
|
###-#### - steve Note: partial final for house only any questions call steve
|
Electrical Rough-In | 1/25/2005 | 1/25/2005 | 1/25/2005 | P | PASS |
Pat Lass
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
Electrical Rough-In | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | FAIL |
Pat Lass
|
|
|
###-#### Call Steve before you go out.
outlet on laundry circuit .
2 2gang boxes overfilled on 2nd floor.
required recep on 3rd floor. 1/24/2005 2:18:24 PM
|
Permanent Service | 12/15/2004 | 12/15/2004 | 12/15/2004 | P | PASS |
William E Thomas
|
|
|
Steve call before you go out; Phone #: ###-#### Internet Inspection Request from: Jan Rice
p/s u/g r ok 12/15/2004 2:48:29 PM
|
Rough-In Permanent Service | 12/14/2004 | 12/14/2004 | 12/14/2004 | P | NR |
Pat Lass
|
|
|
steve - ###-####
had conf.
grounding not done.
missing outlets
hot tub area 12/14/2004 2:30:24 PM
|