Final | 10/7/2004 | 10/7/2004 | 10/7/2004 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 10/7/2004 at 7:48:55 AM. Contact: ###-####.
final ok 10/7/2004 12:33:25 PM
|
Permanent Service | 9/28/2004 | 9/28/2004 | 9/28/2004 | A | PASS |
Joe Ray
|
|
|
p/s ug n ok 9/28/2004 10:13:09 AM
|
Final | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | CANC |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/27/2004 at 9:47:46 AM. Contact: ###-####.
|
Electrical Rough-In | 9/3/2004 | 9/3/2004 | 9/3/2004 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 10:55:03 AM. Contact: ###-####. p/s ug n ok 9/3/2004 2:10:38 PM
|
Electrical Rough-In | 8/12/2004 | 8/13/2004 | 8/13/2004 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/12 8/13/2004 8:26:13 AM 8/13/2004 8:27:21 AM u/g for parking lot lights ok 8/13/2004 10:23:22 AM
|