Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberELE04-02595
StatusFinaled
Name PEAK ELECTRIC
Site Address 6325 N CLOVERDALE RD
Project NameSpringhill Suites by Marriott
Customer Number 
ePlanReview 
Description
8/23/2004 - new construction on hotel - power, lighting, parking lot & ext lighting fire alarm, security - $523,878.00 per initial cert of value////Final cert of value $594,350 cmc///10/6/2005
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/26/20055/26/20055/26/2005APASS
DetailsBob Reichert
final for entire project; Phone #: ###-#### Internet Inspection Request from: todd hall ok to final, signed occ card
Final5/12/20055/12/20055/12/2005PPART
DetailsBob Reichert
Phone #: ###-#### Internet Inspection Request from: todd hall all checked but pool, needto add 2 7-gang switch plates, blank cover, ground copper pipe from air handlers, left corr notice for clearances, signed t/o card and said they have to lock
Conference5/11/20055/11/20055/11/2005PDONE
DetailsBob Reichert
Conference for inspector to meet with electrician and GC on site supervisor to discuss options to correct issues with most recent correction notice.; Phone #: ###-#### Internet Inspection Request from: todd hall discussed requirement to move ref
Final5/6/20055/9/20055/9/2005PFAIL
DetailsBob Reichert
Scheduled by a contractor via Hello! on 5/6/2005 at 2:54:50 PM. Contact: ###-####. 1st floor meeting rooms, offices, laundry, elect, phone rooms inspected. 110.26(A) work space about equipment shall be provided. 30" wide and 3'-0" minimum. 110.26(F)(1) no foreign equipment shall be in dedicated work zone 5/9/2005 1:21:08 PM
Conference5/4/20055/4/20055/4/2005PDONE
DetailsBob Reichert
Scheduled by a contractor via Hello! on 5/4/2005 at 8:39:20 AM. Contact: ###-####. talked about getting ready for final and about temp occ. I said we need to be finalled as much as possible before temp occ. Also pool needs to be done at same time. 5/4/2005 4:15:12 PM
Electrical Rough-In4/26/20054/26/20054/26/2005APASS
DetailsBob Reichert
clg cover ok 1st floor corridor, meeting rooms, offices
Final4/25/20054/26/20054/26/2005ANR
DetailsBob Reichert
Scheduled by a contractor via Hello! on 4/25/2005 at 4:48:26 PM. Contact: ###-####. wanted ri only, see added insp 4/26/2005 10:49:24 AM
Electrical Rough-In4/12/20054/13/20054/13/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 4/12/2005 at 3:22:15 PM. Contact: ###-####. 2,3,4 floor halls ok to cover clg, pool walls and ceiling ok to cover 4/13/2005 4:13:39 PM
Final4/12/20054/12/20054/12/2005PPART
DetailsBob Reichert
4th floor guest rooms north side ok . This should complete guest rooms each floor. Misc meeting rooms etc remain
Final4/8/20054/8/20054/8/2005PPART
DetailsBob Reichert
guest rooms north 1/2 3rd and south 1/2 4th floors .
Final4/5/20054/6/20054/6/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 4/5/2005 at 8:54:06 AM. Contact: ###-####. 1st floor guest rooms ok( south half only) 4/6/2005 10:08:09 AM
Final4/5/20054/5/20054/5/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 4/5/2005 at 8:53:27 AM. Contact: ###-####. 2nd fl no 1/2, 3rd fl so 1/2, 1st fl 8 room so side ok to final 4/5/2005 4:13:51 PM
Final4/4/20054/4/20054/4/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 4/4/2005 at 8:50:18 AM. Contact: ###-####. part final for 2nd floor south 1/2,meeting room ok to cover soffit. 4/4/2005 4:42:02 PM
Electrical Rough-In3/25/20053/25/20053/25/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/25/2005 at 11:05:41 AM. Contact: ###-####. meeting room hard lid ok to cover, walls in lobby area ok to cover. pool rail bonding for ladder ok, but not for handrail since one of the anchors didn't have the ground wire connected. will need to re-check pool. 3/25/2005 4:33:28 PM
Electrical Rough-In3/23/20053/24/20053/24/2005APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/23/2005 at 3:08:21 PM. Contact: ###-####. clg cover front canopy and room off lobby ok to cover 3/24/2005 9:59:58 AM
Electrical Rough-In3/22/20053/23/20053/23/2005APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/22/2005 at 3:52:57 PM. Contact: ###-####. clg for lobby,common area ok to cover 3/23/2005 10:11:26 AM
Electrical Rough-In3/11/20053/14/20053/14/2005APART
DetailsBob Reichert
Chris; Phone #: ###-#### Internet Inspection Request from: Jan Rice ric in elev areas ok, each floor 3/14/2005 10:10:00 AM
Electrical Rough-In3/8/20053/9/20053/9/2005APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/8/2005 at 2:31:33 PM. Contact: ###-####. pool bond ok 3/9/2005 8:06:17 AM
Electrical Rough-In3/3/20053/3/20053/3/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/3/2005 at 11:16:15 AM. Contact: ###-####. 4th floor, n 1/2 soffits, and baths ric ok 3/3/2005 2:39:03 PM
Electrical Rough-In2/28/20052/28/20052/28/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/28/2005 at 8:27:32 AM. Contact: ###-####. 3rd floor north 1/2 soffits, baths ric ok 2/28/2005 2:39:23 PM
Electrical Rough-In2/21/20052/22/20052/22/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/21/2005 at 4:06:28 PM. Contact: ###-####. 2nd floor n 1/2 baths and soffits ok to cover 2/22/2005 8:42:03 AM
Electrical Rough-In2/16/20052/17/20052/17/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/16/2005 at 3:01:33 PM. Contact: ###-####. ric ok common 1st fl area, kitchen, laundry, reception,meetings, walls only. 2/17/2005 8:11:43 AM
Electrical Rough-In2/15/20052/16/20052/16/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/15/2005 at 4:35:03 PM. Contact: ###-####. 3rd floor barths south half, all stairwells ric ok 2/16/2005 8:09:09 AM
Electrical Rough-In2/14/20052/15/20052/15/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/14/2005 at 12:42:51 PM. Contact: ###-####. 4th fl so bath and soffits ok to cover 2/15/2005 8:32:48 AM
Electrical Rough-In2/11/20052/11/20052/11/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/11/2005 at 8:39:31 AM. Contact: ###-####. 2nd floor so of elev bath clg ric 2/11/2005 2:56:04 PM
Electrical Rough-In2/8/20052/9/20052/9/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/8/2005 at 4:02:54 PM. Contact: ###-####. 1st floor south half soffits and bathrooms ok to cover 2/9/2005 2:31:12 PM
Electrical Rough-In2/4/20052/4/20052/4/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/4/2005 at 7:55:14 AM. Contact: ###-####. 4th floor rooms no side ric ok , elect room included. 2/4/2005 2:23:52 PM
Electrical Rough-In1/31/20052/1/20052/1/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 1/31/2005 at 9:13:13 AM. Contact: ###-####. elect rooms 2 and 3 floor ric ok. dist panels floor 1 need strapped and ko seals. 2/1/2005 9:13:06 AM
Electrical Rough-In1/24/20051/24/20051/24/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 1/24/2005 at 10:50:36 AM. Contact: ###-####. 3rd floor south 1/4 soffit lights ok 1/24/2005 4:33:14 PM
Rough-In Permanent Service1/19/20051/20/20051/20/2005APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 1/19/2005 at 5:52:48 PM. Contact: ###-####. Asked elect to have power co provide available fault current data. p/s u/g n ok. 1/20/2005 10:04:22 AM
Electrical Rough-In1/14/20051/14/20051/14/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 1/14/2005 at 7:23:51 AM. Contact: ###-####. 1st floor so rooms to elev ok to cover, 2nd fl soffit lights ok on so 3 rooms 1/14/2005 2:26:59 PM
Electrical Rough-In1/11/20051/12/20051/12/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 1/11/2005 at 4:45:24 PM. Contact: ###-####. ok to cover 4th floor south rooms to elevator and hall, north hall 3rd, and 2nd floors 1/12/2005 3:59:35 PM
Electrical Rough-In1/10/20051/10/20051/10/2005PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 1/10/2005 at 7:58:06 AM. Contact: ###-####. ok to cover room n floor 3 , floor 1 elect and mech walls 1/10/2005 2:52:55 PM
Electrical Rough-In12/22/200412/23/200412/23/2004APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 12/22/2004 at 11:48:25 AM. Contact: ###-####. 3rd floor so end, rooms ok to cover 12/23/2004 8:12:49 AM
Electrical Rough-In12/22/200412/22/200412/22/2004PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 12/22/2004 at 8:13:17 AM. Contact: ###-####. 2nd floor rooms, stairwell landing, elevator area ok to cover 12/22/2004 4:22:48 PM
Electrical Rough-In12/21/200412/21/200412/21/2004PDONE
DetailsBob Reichert
Scheduled by a contractor via Hello! on 12/21/2004 at 9:16:40 AM. Contact: ###-####. met with elect. to discuss required number of receptacles per room. He is going to verify req'd number per his plans, and NEC 210.60. 12/21/2004 5:16:01 PM
Electrical Rough-In12/17/200412/20/200412/20/2004ACANC
DetailsJack Frank
Scheduled by a contractor via Hello! on 12/17/2004 at 2:41:54 PM. Contact: ###-####. contractor is checking on outlet requirements for room 210.60, quest rooms does not have required recept outlets 12/20/2004 10:51:09 AM
Electrical Rough-In12/15/200412/16/200412/16/2004APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 12/15/2004 at 9:59:45 AM. Contact: ###-####. ceilings in halls, floor 1,2,3. 2nd floor south 8 rooms walls and clg. 1st floor kitchenette clg only. told elect to check ext rings on walls with comp. board and sheetrock. ok to cover with sheetrock. 12/16/2004 8:36:20 AM
Conference12/1/200412/2/200412/2/2004ADONE
DetailsBob Reichert
Scheduled by a contractor via Hello! on 12/1/2004 at 1:07:36 PM. Contact: ###-####. Electrical room is too small, they asked if we could reduce clearance and I said no. They can easily move wall. Required for 3 rooms only. 2,3,4, floor. 12/2/2004 10:27:55 AM
Electrical Rough-In11/1/200411/2/200411/2/2004APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 11/1/2004 at 2:02:25 PM. Contact: ###-####. spa bonding ok to cover 11/2/2004 8:43:54 AM
Conference9/28/20049/29/20049/29/2004ADONE
DetailsJoe Ray
Scheduled by a contractor via Hello! on 9/28/2004 at 5:59:45 PM. Contact: ###-####.
Conference9/23/20049/24/20049/24/2004APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 9/23/2004 at 9:26:51 AM. Contact: ###-####.
discussed layout of rooms from print. 9/24/2004 10:06:28 AM
Temporary Service9/20/20049/20/20049/20/2004PFAIL
DetailsJoe Ray
Scheduled by a contractor via Hello! on 9/20/2004 at 7:53:35 AM. Contact: ###-####. t/s shall be permitted seperatly 9/20/2004 10:19:46 AM
Electrical Rough-In9/13/20049/14/20049/14/2004APASS
DetailsJoe Ray
Scheduled by a contractor via Hello! on 9/13/2004 at 2:48:49 PM. Contact: ###-####.
Electrical Rough-In9/2/20049/2/20049/2/2004PPASS
DetailsJoe Ray
Scheduled by a contractor via Hello! on 9/2/2004 at 8:40:36 AM. Contact: ###-####. trench parking lot ok particial 9/2/2004 3:16:07 PM
Electrical Rough-In9/1/20049/1/20049/1/2004PPASS
DetailsJoe Ray
Scheduled by a contractor via Hello! on 9/1/2004 at 8:00:12 AM. Contact: ###-####. underground ok paRKING LOT LIGHTS 9/1/2004 4:00:49 PM
Electrical Rough-In8/31/20048/31/20048/31/2004PPASS
DetailsJoe Ray
Scheduled by a contractor via Hello! on 8/31/2004 at 9:12:28 AM. Contact: ###-####.
Electrical Rough-In8/23/20048/24/20048/24/2004ADONE
DetailsJoe Ray
###-#### todd (for UFER")
Electrical Rough-In8/24/20048/24/20048/24/2004PPASS
DetailsMike Kinnear
ufer inspection ok cover ufer ground 8/24/2004 4:07:17 PM