Final | 12/14/2004 | 12/15/2004 | 12/15/2004 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/14/2004 at 7:35:23 AM. Contact: ###-####.
not ready will reschedual for pm 12/15/2004 8:36:11 AM
|
Final | 12/15/2004 | 12/15/2004 | 12/15/2004 | P | PASS |
Pat Lass
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Jan Rice
signed card 12/15/2004 1:26:23 PM
|
Electrical Rough-In | 12/8/2004 | 12/9/2004 | 12/9/2004 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 7:55:04 AM. Contact: ###-####.
install bond bushings
ground wireway
support boxes and raceways
fix induction at panel 12/9/2004 9:59:21 AM
|
Electrical Rough-In | 9/22/2004 | 9/22/2004 | 9/22/2004 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/22/2004 at 8:12:22 AM. Contact: ###-####.
9/22/2004 3:01:56 PM
U/G Ok 9/22/2004 4:04:00 PM
|