Permit Information
Permit NumberELE04-02639
StatusFinaled
Name DOHERTY ELECTRIC
Site Address 12400 W MCMILLAN RD
Project NameCENTENNIAL HIGH SCHOOL
Customer Number 
ePlanReview 
Description
8/26/2004 - service, lights, outlets, sound system, F/A - $695,361.00 per initial cert of value - cmc
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/16/200512/16/200512/16/2005PPASS
DetailsBob Reichert
Phone #: ###-#### Internet Inspection Request from: Heather Packer no card to sign, open items taken care of, ok to final
Final11/21/200511/21/200511/21/2005PPART
DetailsBob Reichert
Phone #: ###-#### Internet Inspection Request from: Heather Packer walked job with electrician, the open items that shall be fixed:in-use cover on outside recpts, bond hot and cold pipes at water heaters, find listing on stage panel, get test results for gfi on main,add pull point on rooftop unit, strap fa panel conduit. Will recall when done, rest ok.
Electrical Rough-In11/9/200511/10/200511/10/2005APASS
DetailsPat Lass
Call Paul for questions; Phone #: ###-#### Internet Inspection Request from: Heather Packer
Electrical Rough-In10/18/200510/18/200510/18/2005PPART
DetailsBob Reichert
ceiling insp.; Phone #: ###-#### Internet Inspection Request from: Heather Packer south 1/2 hall ceiling ok to cover
Electrical Rough-In10/12/200510/13/200510/13/2005PPASS
DetailsBob Reichert
ceiling should be exposed after lunch. Thanks!; Phone #: ###-#### Internet Inspection Request from: Heather Packer ok to cover clg rm 105 front foyer
Electrical Rough-In10/11/200510/12/200510/12/2005APART
DetailsPat Lass
Ceiling insp.; Phone #: ###-#### Internet Inspection Request from: Heather Packer
I approved 2 sections for cover.
the front had tiles installed and the second section down the hall was not ready yet. I approved the 2 sections next to those areas.
Electrical Rough-In9/13/20059/14/20059/14/2005APASS
DetailsBob Reichert
Phone #: ###-#### Internet Inspection Request from: Heather ok to cover ceiling for rooms 141, 121 122, 123, 124, 125, 126, 127, 128, 129, looked at stage area in front and ok
Electrical Rough-In9/8/20059/9/20059/8/2005ACANC
DetailsBob Reichert
ceiling insp.; Phone #: ###-#### Internet Inspection Request from: Heather Packer Inspection cancelled from web by: Heather Packer
Electrical Rough-In8/31/20059/1/20059/1/2005APART
DetailsBob Reichert
ceiling insp. Thanks!; Phone #: ###-#### Internet Inspection Request from: Heather Packer clg cover ok, see dwg, ok for covers in elect room
Electrical Rough-In8/30/20058/31/20058/31/2005APART
DetailsBob Reichert
ceiling insp.; Phone #: ###-#### Internet Inspection Request from: Heather Packer clg cover ok for rooms marked on print in office
Electrical Rough-In8/1/20058/2/20058/2/2005APART
DetailsWilliam E Thomas
ceiling///paul; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
south bathrooms only
Electrical Rough-In7/26/20057/27/20057/27/2005APASS
DetailsBob Reichert
Phone #: ###-#### Internet Inspection Request from: Heather Packer soffits so end auditorium and north half of foyer ok to cover
Electrical Rough-In7/7/20057/7/20057/7/2005PPASS
DetailsBob Reichert
RI for walls. Thanks!; Phone #: ###-#### Internet Inspection Request from: Heather Packer front foyer walls only, and bath walls and clg ok to cover
Permanent Service6/24/20056/27/20056/27/2005PPASS
DetailsBob Reichert
paul; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie asked contr to check w/ ipco for available fault current with xfmr being close to switchgear. contr will add 1 more ground clamp to water pipe coming in bldg. p/s u/g n ok
Electrical Rough-In6/10/20056/13/20056/13/2005APASS
DetailsBob Reichert
RI for walls. Thanks!; Phone #: ###-#### Internet Inspection Request from: Heather Packer e and w wall auditorium and elect room ok to cover
Electrical Rough-In6/2/20056/2/20056/2/2005PPASS
DetailsBob Reichert
Wall rough-in. Thanks!; Phone #: ###-#### Internet Inspection Request from: Heather Packer sw and west wall ok to cover
Conference4/6/20054/6/20054/6/2005PDONE
DetailsBob Reichert
###-#### - paul talked aqbout wireway and derate. Will get back to contr. tomorrow. 4/6/2005 4:17:26 PM
Electrical Rough-In3/15/20053/16/20053/16/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/15/2005 at 8:44:25 AM. Contact: ###-####. Mainly job walk to get familiar with job, pointed out foreign piping over elect equip in elect room, signed their inspection log 3/16/2005 9:53:53 AM
ELE-Aging Inspection12/27/200412/27/200412/27/2004PNR
DetailsBob Reichert
doing block work. More u/g coming.
Electrical Rough-In9/16/20049/16/20049/16/2004PPASS
DetailsJoe Ray
Scheduled by a contractor via Hello! on 9/16/2004 at 7:36:41 AM. Contact: ###-####. concrete encased electrode ok to cover 9/16/2004 3:27:07 PM
Electrical Rough-In9/8/20049/8/20049/8/2004PPASS
DetailsJoe Ray
mike ###-#### 9/8/2004 9:13:52 AM
Conference9/7/20049/7/20049/7/2004PCANC
DetailsJoe Ray
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Permanent Service8/31/20049/1/20049/1/2004PPASS
DetailsJoe Ray
Phone #: ###-#### Internet Inspection Request from: Heather Packer p/s ug n ok 9/1/2004 2:33:32 PM
Rough-In Permanent Service8/31/20048/31/20048/31/2004PPASS
DetailsJoe Ray
Scheduled by a contractor via Hello! on 8/31/2004 at 7:59:20 AM. Contact: ###-####. underground ok 8/31/2004 2:52:55 PM