Final | 9/14/2004 | 9/15/2004 | 9/15/2004 | A | PASS |
Jack Frank
|
|
|
We have exposed the conduit where-ever it is not at proper depth to make the conduit into a surface run.Jim met me onsite and this is what we came up with as the solution.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok 9/15/2004 8:51:49 AM
|
Final | 9/7/2004 | 9/8/2004 | 9/8/2004 | A | FAIL |
Pat Lass
|
|
|
300.5 9/8/2004 12:34:26 PM
|
Rough-In Permanent Service | 9/7/2004 | 9/7/2004 | 9/7/2004 | P | NR |
Pat Lass
|
|
|
We:1)Replaced the old UF romex between the garage and the booster pump vault with IMC conduit and THHN wires.2)Installed a weather proof single receptacle in the vault and a pigtail cord on the existing booster pump as a disconnect.Thanks!!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|