Final | 10/19/2004 | 10/20/2004 | 10/20/2004 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 10/19/2004 at 7:23:26 PM. Contact: ###-####.
|
Electrical Rough-In | 9/17/2004 | 9/17/2004 | 9/17/2004 | P | PASS |
Joe Ray
|
|
|
###-#### greg
|
Electrical Rough-In | 9/12/2004 | 9/13/2004 | 9/13/2004 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/12/2004 at 10:20:01 PM. Contact: ###-####. corrections not made 9/13/2004 10:47:26 AM
|
Electrical Rough-In | 9/10/2004 | 9/10/2004 | 9/10/2004 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/10/2004 at 7:35:52 AM. Contact: ###-####.
Parallell protection of ent 9/10/2004 1:18:26 PM
|