Final | 10/14/2004 | 10/15/2004 | 10/15/2004 | A | PASS |
Joe Ray
|
|
|
We performed the corrections and are ready for re-inspection.Jack did the original inspection so check with him for details or give me a call.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
Rough-In Permanent Service | 9/22/2004 | 9/23/2004 | 9/23/2004 | P | FAIL |
Jack Frank
|
|
|
We:1)bonded the hot tub and created a bonding grid.2)GFCI protected the hot tub and pool.3)GFCI protected the lights around the hot tub.4)GFCI protected the kitchen receptacles.5)GFCI protected the bath room receptacles.6)GFCI protected the outdoor receptacles.7)installed his new range hood.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchellcor. posted called 680.43(C) switches too close to tub, 250.8 NO SMS , 210.8 recepts left and right of kit. sink no gfci, 680.26(C) SSsteel , brass, copper,or copper alloy for bonding lugs 9/23/2004 2:46:22 PM
|