Final | 11/9/2004 | 11/10/2004 | 11/10/2004 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/9/2004 at 8:09:30 AM. Contact: ###-####. ok to final ,contr. will do some demo work on exst ups sys. 11/10/2004 9:51:01 AM
|
Electrical Rough-In | 10/18/2004 | 10/18/2004 | 10/18/2004 | P | NR |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 10/18/2004 at 8:31:04 AM. Contact: ###-####.
not ready had confrence with contractor, they still need to talk with pat 10/18/2004 2:06:22 PM
|
Conference | 9/24/2004 | 9/27/2004 | 9/27/2004 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 7:26:29 AM. Contact: ###-####.
|