Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberELE04-02972
StatusFinaled
Name MITCHELL ELECTRIC
Site Address 1009 W FORT PL
Project Name 
Customer Number 
ePlanReview 
Description
9/28/2004 - complete service upgrade and re-wire bldg - $7,500.00 per initial cert of value - cmc///Final cert of value $19,040///1/28/05 BAS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/5/20051/5/20051/5/2005PPASS
DetailsPat Lass
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Electrical Rough-In12/30/20041/3/20051/3/2005ADONE
DetailsPat Lass
We would like a rough-in insp. for the small back building.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
done by Jim 12-20 1/3/2005 9:35:31 AM
Electrical Rough-In12/17/200412/20/200412/20/2004APASS
DetailsWilliam E Thomas
We would like the detached garage building inspected for cover.Thanks!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell 12/20/2004 9:07:42 AM
ri ok 12/20/2004 9:13:54 AM
Final11/2/200411/3/200411/3/2004ANR
DetailsPat Lass
Furniture has been moved for your access.Ready for Final on the main building.Garage work is yet to begin.THANKS!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell\

there is still an open switch box by the back door.

this is for partial final, house only, garage has no work done and is on this permit 11/3/2004 9:00:35 AM
Final11/3/200411/3/200411/3/2004PPART
DetailsPat Lass
We installed the blank cover on the open box on the back porch area.(painters had removed it).THANKS!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
T/O Ok for house portion
11/3/2004 2:24:41 PM
Rough-In Permanent Service10/29/200411/1/200411/1/2004ANH
DetailsWilliam E Thomas
Ready for final inspection in the main building only.The seperate garage is not ready yet.Thanks!!!!Dan; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
no access to outlets, owners already moved in 11/1/2004 10:58:40 AM
Electrical Rough-In10/15/200410/15/200410/15/2004PPART
DetailsWilliam E Thomas
Ready for trench inspection now.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
CONDUITS TO GARAGE OK 10/15/2004 2:11:02 PM
Electrical Rough-In10/14/200410/14/200410/14/2004PNR
DetailsPat Lass
We would like a trench inspection between the main building and the small back building as close to noon as possible so we can backfill.Thanks!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
Rough-In Permanent Service9/28/20049/29/20049/29/2004APASS
DetailsPat Lass
We:1)installed a new 200 amp service and panel. 2)left the existing service and panel connected to provide construction power.3)rewired the whole building from the new 200 amp panel in the basement.4)we'll delete the old service and panel and wiring as soon as Idaho Power energizes the new 200 amp service.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
R/I Ok
P/S O/H R Ok 9/29/2004 10:14:00 AM