Final | 1/5/2005 | 1/5/2005 | 1/5/2005 | P | PASS |
Pat Lass
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Electrical Rough-In | 12/30/2004 | 1/3/2005 | 1/3/2005 | A | DONE |
Pat Lass
|
|
|
We would like a rough-in insp. for the small back building.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
done by Jim 12-20 1/3/2005 9:35:31 AM
|
Electrical Rough-In | 12/17/2004 | 12/20/2004 | 12/20/2004 | A | PASS |
William E Thomas
|
|
|
We would like the detached garage building inspected for cover.Thanks!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell 12/20/2004 9:07:42 AM
ri ok 12/20/2004 9:13:54 AM
|
Final | 11/2/2004 | 11/3/2004 | 11/3/2004 | A | NR |
Pat Lass
|
|
|
Furniture has been moved for your access.Ready for Final on the main building.Garage work is yet to begin.THANKS!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell\
there is still an open switch box by the back door.
this is for partial final, house only, garage has no work done and is on this permit 11/3/2004 9:00:35 AM
|
Final | 11/3/2004 | 11/3/2004 | 11/3/2004 | P | PART |
Pat Lass
|
|
|
We installed the blank cover on the open box on the back porch area.(painters had removed it).THANKS!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
T/O Ok for house portion
11/3/2004 2:24:41 PM
|
Rough-In Permanent Service | 10/29/2004 | 11/1/2004 | 11/1/2004 | A | NH |
William E Thomas
|
|
|
Ready for final inspection in the main building only.The seperate garage is not ready yet.Thanks!!!!Dan; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
no access to outlets, owners already moved in 11/1/2004 10:58:40 AM
|
Electrical Rough-In | 10/15/2004 | 10/15/2004 | 10/15/2004 | P | PART |
William E Thomas
|
|
|
Ready for trench inspection now.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
CONDUITS TO GARAGE OK 10/15/2004 2:11:02 PM
|
Electrical Rough-In | 10/14/2004 | 10/14/2004 | 10/14/2004 | P | NR |
Pat Lass
|
|
|
We would like a trench inspection between the main building and the small back building as close to noon as possible so we can backfill.Thanks!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
Rough-In Permanent Service | 9/28/2004 | 9/29/2004 | 9/29/2004 | A | PASS |
Pat Lass
|
|
|
We:1)installed a new 200 amp service and panel. 2)left the existing service and panel connected to provide construction power.3)rewired the whole building from the new 200 amp panel in the basement.4)we'll delete the old service and panel and wiring as soon as Idaho Power energizes the new 200 amp service.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
R/I Ok
P/S O/H R Ok 9/29/2004 10:14:00 AM
|