Final | 6/24/2005 | 6/24/2005 | 6/24/2005 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 6/24/2005 at 10:25:54 AM. Contact: ###-####.
|
Final | 6/23/2005 | 6/24/2005 | 6/24/2005 | A | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 6/23/2005 at 3:35:36 PM. Contact: ###-####. wrong fixture over the bathtub
|
Final | 6/22/2005 | 6/23/2005 | 6/23/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/22/2005 at 11:36:37 AM. Contact: ###-####. 110.3 loose conns at disposals shall be tightened, 408.4 breakers shall be labelled, 406.4 loose recpt in master bath shall be tightened, 410.4(D) fixt over tub shall be replaced, called contr, left corr notice.
|
Final | 4/18/2005 | 4/19/2005 | 4/19/2005 | P | NH |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 4/18/2005 at 2:11:35 PM. Contact: ###-####. 4/19/2005 7:33:37 AM
remove furniture for access i checked outside and garage 4/19/2005 2:24:38 PM
|
Rough-In Permanent Service | 10/19/2004 | 10/20/2004 | 10/20/2004 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 10/19/2004 at 5:00:03 PM. Contact: ###-####.
ri ok
p/s u/g n ok 10/21/2004 12:14:12 PM
|