Permit Information
Permit NumberELE04-03271
StatusFinaled
Name ROBERTSON ELECTRIC
Site Address 1141 S ALLANTE AVE
Project Name 
Customer Number 
ePlanReview 
Description
complete wiring for 4,492 sq.ft. shell & tenant office space $23,585 JRR 10-21-04///Final cert of value $24,330///2/1/05 BAS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/14/20051/18/20051/18/2005APASS
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/14/2005 at 12:16:30 PM. Contact: ###-####. ok asked builder if card was on site he said no 1/18/2005 9:11:20 AM
Final1/13/20051/14/20051/14/2005AFAIL
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/13/2005 at 3:49:11 PM. Contact: ###-####. met with contractor he did not open up all fixtures, the first one I opened was not done as 250.8 states , he used sheet metal screws for grd. told him again all fixtures shall be opened up for inspection cor, fee due 1/14/2005 12:30:06 PM
Final1/13/20051/13/20051/13/2005PFAIL
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/13/2005 at 7:42:33 AM. Contact: ###-####. needs fixtures opened,soI can inspect to see if violation corrected, and no access to mech. rm and install all fixtures outside job not ready called 1/13/2005 3:41:19 PM
Electrical Rough-In12/27/200412/28/200412/28/2004APASS
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 12/27/2004 at 1:53:09 PM. Contact: ###-####. ok cover in slab boxes in 2 rms
note mc cable in fixtures without connectors 12/28/2004 9:41:28 AM
Electrical Rough-In12/27/200412/27/200412/27/2004PNH
DetailsJack Frank
Scheduled by a contractor via Hello! on 12/27/2004 at 8:45:18 AM. Contact: ###-####. called notice posted 12/27/2004 1:49:00 PM
Electrical Rough-In11/15/200411/16/200411/16/2004APASS
DetailsJack Frank
Scheduled by a contractor via Hello! on 11/15/2004 at 11:17:01 AM. Contact: ###-####. u/g ok , 2 other locations they will remove floor boxes and concrete over 11/16/2004 11:11:18 AM
Permanent Service11/12/200411/15/200411/15/2004APASS
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 11/12/2004 at 3:42:16 PM. Contact: ###-####. meter spaces labled
p/s u/g n ok 11/15/2004 10:33:18 AM
Permanent Service11/11/200411/12/200411/12/2004ANR
DetailsJack Frank
Scheduled by a contractor via Hello! on 11/11/2004 at 8:07:46 AM. Contact: ###-####. needs to I D meter spaces called 11/12/2004 11:42:28 AM
Rough-In Permanent Service10/26/200410/26/200410/26/2004PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/26/2004 at 8:30:19 AM. Contact: ###-####. r/i for walls and ceiling ok only cor. posted called B C C u/g covered before inspection, 250.24 GEC shall terminate to neutral not equip. grd bus , and ID meter space 10/26/2004 4:40:51 PM