Final | 3/22/2005 | 3/23/2005 | 3/23/2005 | A | PASS |
Pat Lass
|
|
|
final on addition Internet Inspection Request from: Andy Rose
|
Rough-In Permanent Service | 11/24/2004 | 11/29/2004 | 11/29/2004 | A | PASS |
Pat Lass
|
|
|
need rough in and service inspection Internet Inspection Request from: Andy Rose
|
Permanent Service | 10/25/2004 | 10/25/2004 | 10/25/2004 | P | PASS |
William E Thomas
|
|
|
need inspection on new 400 amp service so idaho power can connect.( we did not install temporary service that is already there it was done by another electrical contractor.) Internet Inspection Request from: Andy Rose
p/s u/g reconnect ok 10/25/2004 12:56:11 PM
|