Final | 1/20/2005 | 1/21/2005 | 1/21/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 3:50:47 PM. Contact: ###-####.
|
Final | 1/17/2005 | 1/18/2005 | 1/18/2005 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 11:03:39 AM. Contact: ###-####.
requires recep within 20 ft 1/18/2005 11:45:04 AM
|
Electrical Rough-In | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | PASS |
William E Thomas
|
|
|
###-#### - doug Note: potting compound setting for lights
potting compound ok 12/20/2004 3:19:03 PM
|
Electrical Rough-In | 11/5/2004 | 11/8/2004 | 11/8/2004 | A | PASS |
Pat Lass
|
|
|
###-#### bonding inspection please////doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 11/8/2004 8:00:51 AM
|
Final | 11/3/2004 | 11/4/2004 | 11/4/2004 | A | NR |
Pat Lass
|
|
|
Doug-Trench only inspec.; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|