Final | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 4:28:27 PM. Contact: ###-####. ok to final 1/7/2005 7:53:17 AM
|
Final | 1/5/2005 | 1/6/2005 | 1/6/2005 | P | NH |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/5/2005 at 8:09:48 AM. Contact: ###-####. nh ,called, wrong number,left poster. 1/6/2005 3:03:06 PM
|
Final | 1/5/2005 | 1/6/2005 | 1/6/2005 | A | NH |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/5/2005 at 4:35:01 PM. Contact: ###-####. no access, left card, called contr. 1/6/2005 8:56:07 AM
|
Rough-In Permanent Service | 12/1/2004 | 12/3/2004 | 12/3/2004 | A | PASS |
Bob Reichert
|
|
|
steve- ###-#### called contr. and told he needed about 5 nailplates and that BCC requires outside wire to be made up. ok to cover. p/s u/g n ok 12/3/2004 10:07:55 AM
|