Final | 5/4/2005 | 5/4/2005 | 5/4/2005 | P | PASS |
Pat Lass
|
|
|
###-#### brian
P/S O/H R OK 5/4/2005 3:32:46 PM
|
Final | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/3/2005 at 3:33:39 PM. Contact: ###-####.
guy support does not withstand strain of drop. 1/4/2005 10:02:13 AM
|
Final | 12/16/2004 | 12/16/2004 | 12/16/2004 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/16/2004 at 10:03:01 AM. Contact: ###-####.
install guy or stiff-leg on mast.
install grounding at out building.
have only one source or power to building 12/16/2004 3:02:42 PM
|