Final | 4/5/2005 | 4/5/2005 | 4/5/2005 | P | PASS |
Pat Lass
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
no card 4/5/2005 2:27:50 PM
|
Final | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | FAIL |
Pat Lass
|
|
|
jim --; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
open ground on one recep and line load reversed on kitchen circuit 4/4/2005 1:18:44 PM
|
Final | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | NR |
Pat Lass
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
2 circuits to feed kitchen
remove hot tub
3 way stairs
install recep on counter 3/23/2005 1:50:09 PM
|
Rough-In Permanent Service | 1/20/2005 | 1/20/2005 | 1/20/2005 | P | PART |
Pat Lass
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
P/S O/H R Ok for power only
line side to disconnect ok
has some grounding to water must redo ground rods.
shall remove hot tub before final
load side not finished. 1/20/2005 3:24:05 PM
|
Electrical Rough-In | 12/16/2004 | 12/17/2004 | 12/17/2004 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/16/2004 at 3:00:37 PM. Contact: ###-####.
|
Electrical Rough-In | 12/10/2004 | 12/10/2004 | 12/10/2004 | P | PART |
Pat Lass
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
had conf 12/10/2004 3:34:25 PM
|