Final | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/26/2005 at 10:28:31 PM.
|
Final | 9/25/2005 | 9/26/2005 | 9/26/2005 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/25/2005 at 8:05:03 PM. in-use cover receps flush with covers lock-out for heater install bath fixture
|
Rough-In Permanent Service | 9/5/2005 | 9/6/2005 | 9/6/2005 | A | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 9/5/2005 at 9:26:06 PM. Contact: ###-####. P/S O/H N Ok
|
Electrical Rough-In | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | PASS |
Pat Lass
|
|
|
chad; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Conference | 4/18/2005 | 4/19/2005 | 4/19/2005 | A | FAIL |
Pat Lass
|
|
|
###-#### chad-- per pat lass 8:30 for homeowner; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 4/19/2005 7:33:03 AM
stood up 4/19/2005 9:23:18 AM
|
Conference | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 4/19/2005 at 9:42:18 AM. Contact: ###-####. 4/19/2005 11:44:06 AM
talked about general wiring 4/19/2005 1:59:03 PM
|