Final | 9/18/2006 | 9/19/2006 | 9/19/2006 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/18/2006 at 2:48:28 PM. Contact: ###-####.
|
Final | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/24/2006 at 1:36:20 PM. Contact: ###-#### trim for closet light in-use covers outside cover for recep for jetted tub
|
Electrical Rough-In | 10/31/2005 | 10/31/2005 | 10/31/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/31/2005 at 8:15:25 AM. Contact: ###-####.
|
Electrical Rough-In | 10/27/2005 | 10/28/2005 | 10/28/2005 | P | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 10/27/2005 at 11:24:29 AM. Contact: ###-####. 225.30, 225.31,225.36
|
Rough-In Permanent Service | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 7/27/2005 at 9:52:56 AM. Contact: ###-####. P/S O/H R Ok
|
Rough-In Permanent Service | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/26/2005 at 3:59:37 PM. Contact: ###-####. GEC to go to neutral
|
Rough-In Permanent Service | 7/25/2005 | 7/26/2005 | 7/26/2005 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/25/2005 at 1:33:51 PM. Contact: ###-#### use listed MBJ use plastic romex connector on GEC and acorn on electrode. will eather move panel or make a utility room behind closet.
|
Permanent Service | 7/20/2005 | 7/22/2005 | 7/22/2005 | A | FAIL |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 7/20/2005 at 12:27:38 PM. Contact: ###-####. 314.17 Conductors Entering Boxes, Conduit Bodies, or Fittings. Conductors entering boxes, conduit bodies, or fittings shall be protected from abrasion and shall comply with 314.17(A) through (D). 300.15 Boxes, Conduit Bodies, or Fittings - Where Required. Fittings and connectors shall be used only with the specific wiring methods for which they are designed and listed. 230.24 Clearances. Service-drop conductors shall not be readily accessible and shall comply with 230.24(A) through (D) for services not over 600 volts, nominal. 230.26 Point of Attachment. In no case shall this point of attachment be less than 3.0 m (10 ft) above finished grade.
|
Electrical Rough-In | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 9:02:11 AM. Contact: ###-####.
|
Electrical Rough-In | 3/14/2005 | 3/15/2005 | 3/15/2005 | P | PASS |
Pat Lass
|
|
|
niki; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Electrical Rough-In | 1/26/2005 | 1/26/2005 | 1/26/2005 | P | PART |
Pat Lass
|
|
|
andy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
west end ok 1/26/2005 2:09:12 PM
|
Electrical Rough-In | 1/19/2005 | 1/21/2005 | 1/21/2005 | P | NR |
Pat Lass
|
|
|
niki; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
had conf about circuiting and location of receps 1/21/2005 1:20:41 PM
|