Final | 5/11/2005 | 5/11/2005 | 5/11/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/11/2005 at 8:09:07 AM. Contact: ###-####. corrections made, ok to final
|
Final | 5/9/2005 | 5/10/2005 | 5/11/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/9/2005 at 12:59:16 PM. Contact: ###-####. 406.4 loose recpt front room, laundry room and switch in laundry room, 210.8(A)(6) kitchen recpt shall be gfci left of sink, 422.32 shall provide lock out for di
|
Electrical Rough-In | 12/27/2004 | 12/28/2004 | 12/28/2004 | A | NH |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/27/2004 at 2:26:09 PM. Contact: ###-####. called and told them to reschedule when access is available. 12/28/2004 9:05:16 AM
|
Electrical Rough-In | 12/28/2004 | 12/28/2004 | 12/28/2004 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 11:14:38 AM. Contact: ###-####. ok to cover. p/s u/g n ok 12/28/2004 3:38:55 PM
|
Electrical Rough-In | 12/22/2004 | 12/23/2004 | 12/23/2004 | P | NR |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/22/2004 at 2:11:45 PM. Contact: ###-####. met with electrician and discussed adding recpts, stapling romex, nail plates, spacing, grounding. Not ready until next week sometime. 12/23/2004 3:39:26 PM
|