Final | 6/3/2005 | 6/3/2005 | 6/3/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/3/2005 at 9:01:42 AM. Contact: ###-####. corrections made, signed card for occupancy, ok to final
|
Final | 6/3/2005 | 6/3/2005 | 6/3/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/3/2005 at 6:49:38 AM. Contact: ###-####. incomplete changes from corr notice, called contr and he will finish grounding req'd and recall this pm
|
Final | 6/1/2005 | 6/2/2005 | 6/2/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 3:13:10 PM. Contact: ###-####. called contr, left corr notice, 400.8(5) flex shall not be above clg,400.8(1) flex cord shall not be used for perm wiring,408.4 ckt directory shall be sufficient d
|
Electrical Rough-In | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | PASS |
Bob Reichert
|
|
|
ceiling only-- steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ceiling cover ok 4/21/2005 8:37:59 AM
|
Permanent Service | 2/25/2005 | 2/28/2005 | 2/28/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/25/2005 at 4:34:01 PM. Contact: ###-####. corrected by adding drip shield over panels. p/s u/g n ok 2/28/2005 9:07:10 AM
|
Permanent Service | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 7:34:27 AM. Contact: ###-####. 110.26(F)(1)(b) protection shall be provided from foreign systems over panels, called left message, left corr notice 2/24/2005 12:58:52 PM
|
Electrical Rough-In | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 4:17:22 PM. Contact: ###-####. ric walls and clg only ok, talked about pullbox for service. 2/18/2005 9:03:47 AM
|
Electrical Rough-In | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | PART |
Bob Reichert
|
|
|
uepher ground inspection please////steve ###-#### ok to cover for ufer only 12/17/2004 3:46:43 PM
|