Final | 10/18/2005 | 10/18/2005 | 10/18/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/18/2005 at 11:27:36 AM. Contact: ###-####. no card
|
Electrical Rough-In | 5/17/2005 | 5/18/2005 | 5/18/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/17/2005 at 5:39:02 PM. Contact: ###-####.
|
Permanent Service | 4/27/2005 | 4/28/2005 | 4/28/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/27/2005 at 2:28:07 PM. Contact: ###-####.
P/S O/H R Ok 4/27/2005 3:10:27 PM
|
Permanent Service | 4/27/2005 | 4/27/2005 | 4/27/2005 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/27/2005 at 10:07:36 AM. Contact: ###-####.
Plans and permit do not indicate that this can have 2 meters.
approved plans not on site. 4/27/2005 1:06:59 PM
|