Final | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Bob Reichert
|
|
|
kelly; Phone #: ###-#### Internet Inspection Request from: Barbara Moore corrections made ok to final 4/4/2005 12:01:42 PM
|
Final | 3/31/2005 | 4/1/2005 | 4/1/2005 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/31/2005 at 3:44:09 PM. Contact: ###-####. 110.26(F)(1)(b) leak protection shall be provided over panel, 314.25 boxes shall be covered, 408.4,panel schedule shall be correct 4/1/2005 9:49:31 AM
|
Final | 3/31/2005 | 3/31/2005 | 3/31/2005 | P | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/31/2005 at 10:07:59 AM. Contact: ###-####. notice posted called 3/31/2005 3:11:06 PM
|
Electrical Rough-In | 1/4/2005 | 1/4/2005 | 1/4/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 9:37:04 AM. Contact: ###-####. ok to cover walls only 1/4/2005 4:25:15 PM
|
Electrical Rough-In | 12/30/2004 | 12/30/2004 | 12/30/2004 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/30/2004 at 8:29:16 AM. Contact: ###-####. 250.86 raceway shall be grounded thru concentric,358.30 emt shall be strapped within 3' of panel,110.26(F)(1)(b) leak protection shall be provided over panel, 210.62 showroom recpt shall be added 12/30/2004 1:07:53 PM
|