Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberELE04-04022
StatusFinaled
Name ROMAR ELECTRIC
Site Address 301 S CAPITOL BLVD
Project NameBODO BUILDING 7
Customer Number 
ePlanReview 
Description
Electrical Permit - New: ELECTRICAL WORK FOR BODO'S BUILDING #7
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/21/200512/21/200512/21/2005PPASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 12/21/2005 at 8:25:34 AM. Contact: ###-####. signed occ card, ok to final
Final12/12/200512/13/200512/13/2005ANR
DetailsBob Reichert
kendall; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa project still requires about 600' of conduit to be run, rest ok
Final10/28/200510/31/200510/31/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 10/28/2005 at 3:22:02 PM. Contact: ###-####. signed t/o card, need to install hall heaters, left corr notice
Final10/27/200510/28/200510/28/2005ANR
DetailsBob Reichert
Scheduled by a contractor via Hello! on 10/27/2005 at 4:06:45 PM. Contact: ###-####. told contr to call when done
Electrical Rough-In10/11/200510/12/200510/12/2005APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 10/11/2005 at 2:43:11 PM. Contact: ###-####. stair well walls ok to cover anop
ELE-Aging Inspection9/19/20059/19/20059/19/2005 NR
DetailsPat Lass
suc
Permanent Service7/19/20057/19/20057/19/2005PFAIL
DetailsPat Lass
Scheduled by a contractor via Hello! on 7/19/2005 at 8:33:14 AM. Contact: ###-####.
110.26
Conference5/4/20055/4/20055/4/2005 PASS
DetailsJim Schmer
conference on conduit thats covered with concrete. Contractor will saw cut 3 locations of slab to see compaction and type of conduit and depth. Also Cabel One will come in and do a trace on conduit, with spray painting floor every 5' to identify direction of conduit for number of bends. JMS
Electrical Rough-In5/4/20055/4/20055/4/2005PPART
DetailsPat Lass
###-####. Scheduled by a contractor via Hello! on 5/4/2005 at 8:27:07 AM. Contact: ###-####. 5/4/2005 11:34:06 AM
partial U/G Ok
14 runs to be located and pot holed 5/4/2005 2:57:59 PM
Electrical Rough-In5/2/20055/2/20055/2/2005PFAIL
DetailsPat Lass
###-####. Scheduled by a contractor via Hello! on 5/2/2005 at 7:55:09 AM. Contact: ###-####. 5/2/2005 11:38:47 AM
conduit covered prior to inspection shall not be used unless exposed for inspection. 5/2/2005 4:22:07 PM
Electrical Rough-In4/26/20054/26/20054/26/2005PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 4/26/2005 at 8:56:46 AM. Contact: ###-####.
Electrical Rough-In2/16/20052/16/20052/16/2005ANR
DetailsPat Lass
conduit covered without inspection 2/16/2005 10:12:34 AM