Final | 1/13/2005 | 1/14/2005 | 1/14/2005 | A | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Richard Jones
|
Final | 1/11/2005 | 1/11/2005 | 1/11/2005 | A | NR |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Richard Jones need power on to final. see comment for p/s. 1/11/2005 8:40:12 AM
|
Permanent Service | 1/11/2005 | 1/11/2005 | 1/11/2005 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Richard Jones left correction notice: 408.4 All circuits shall be identified, 200.7(A)(1) White wire shall be used for grounded circuit conductor only, 250.53(B) Electrodes shall be minimum 6' apart. Will allow power to come in,he will fix today. Can't do final till power on.Need to check inside panel and well at final. p/s o/h n ok. 1/11/2005 8:38:56 AM
|
Electrical Rough-In | 1/4/2005 | 1/5/2005 | 1/5/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 6:23:07 PM. Contact: ###-####. r/i ok 1/5/2005 10:08:46 AM
|
Electrical Rough-In | 12/29/2004 | 12/30/2004 | 12/30/2004 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 10:33:58 PM. Contact: ###-####. conference ok only 12/30/2004 9:40:43 AM
|
Conference | 12/29/2004 | 12/29/2004 | 12/29/2004 | P | NH |
Bob Reichert
|
|
|
Richard; Phone #: ###-#### Internet Inspection Request from: Jan Rice nobody at job site. Called contr. and he couldn't be there . Told me he forgot to call and set up time. He will call for tomorrow and set up an appointment time. 12/29/2004 3:03:17 PM
|
Rough-In Permanent Service | 12/27/2004 | 12/27/2004 | 12/27/2004 | P | NR |
Mike Kinnear
|
|
|
richard ###-#### not ready-- called contractor told him get job ready & call in for conf with 315 12/27/2004 1:48:04 PM
|