Final | 3/4/2005 | 3/7/2005 | 3/7/2005 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/4/2005 at 2:09:23 PM. Contact: ###-####. ok card signed 3/7/2005 2:30:31 PM
|
Electrical Rough-In | 2/9/2005 | 2/9/2005 | 2/9/2005 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 7:10:28 AM. Contact: ###-####. ceiling ok 2/9/2005 1:18:50 PM
|
Electrical Rough-In | 1/20/2005 | 1/21/2005 | 1/21/2005 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 2:14:16 PM. Contact: ###-####. walls ok 1/21/2005 2:33:10 PM
|