Final | 3/2/2005 | 3/3/2005 | 3/3/2005 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 12:53:35 PM. Contact: ###-####.
|
Final | 1/9/2005 | 1/10/2005 | 1/10/2005 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/9/2005 at 5:53:24 PM. Contact: ###-####.
ungrounded 3 prong receps. 1/10/2005 9:51:25 AM
|
Electrical Rough-In | 1/6/2005 | 1/6/2005 | 1/6/2005 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 8:31:47 AM. Contact: ###-####.
|
Conference | 12/30/2004 | 12/30/2004 | 12/30/2004 | P | PART |
Pat Lass
|
|
|
steven ###-####
|