Final | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 10:04:35 AM. Contact: ###-####. called contr left survey, 352.30(A) rnc shall be supported within 3'-0 of conduit termination, 406.4(A) recpts shall be rigidly held 4/25/2005 12:48:24 PM
|
Rough-In Permanent Service | 3/7/2005 | 3/7/2005 | 3/7/2005 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 8:05:02 AM. Contact: ###-####. called contr. told him he needs access point for conc encased electrode . ric ok p/s u/g n ok 3/7/2005 2:03:59 PM
|
Electrical Rough-In | 2/14/2005 | 2/14/2005 | 2/14/2005 | P | PART |
Bob Reichert
|
|
|
Zane; Phone #: ###-#### Internet Inspection Request from: Jan Rice called contr and told him an approved set of plans had to be on job. ok to cover outside soffit only. 2/14/2005 1:52:17 PM
|
Electrical Rough-In | 2/11/2005 | 2/11/2005 | 2/11/2005 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/11/2005 at 10:47:11 AM. Contact: ###-####. called no address or dirt card could not locate 2/11/2005 1:21:24 PM
|