Final | 2/17/2005 | 2/17/2005 | 2/17/2005 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 9:23:21 AM. Contact: ###-####. called contr. ok to final . told contr to bond hot and cold water water lines at heater, strap downstairs, cover in clg box, gfci in mop and bath, and switch cover . he will call when done 2/17/2005 1:52:19 PM
|
Final | 2/9/2005 | 2/9/2005 | 2/9/2005 | A | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 7:29:25 AM. Contact: ###-####. sheetrock not completed called they to call it in when ready 2/9/2005 9:07:00 AM
|
Electrical Rough-In | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | PART |
Jack Frank
|
|
|
lorn; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok up and down stairs, address show window outlets, and ceiling fans support from structure,or approved boxes
1/24/2005 3:02:29 PM
|