Electrical Rough-In | 8/26/2005 | 8/26/2005 | 8/26/2005 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/26/2005 at 5:57:01 AM. Contact: ###-####. potting ok
|
Electrical Rough-In | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Pat Lass
|
|
|
rowdy-- for conduit underground insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Electrical Rough-In | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PART |
Pat Lass
|
|
|
pool bonding inspection please///rowdy ###-####
|