Final | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | PASS |
Jack Frank
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok survey posted 210.5(A B C) shall provide ID of grounded, and ungrounded conductors at 480 V p/s, and spray booth, oven control panels 4/19/2005 3:06:40 PM
|
Final | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | PASS |
Jack Frank
|
|
|
final ok survey posted no card
|
Final | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | CANC |
Jack Frank
|
|
|
doug ###-#### cotractor called I told him to call JSchmer 4/15/2005 12:28:11 PM
|
Electrical Rough-In | 4/13/2005 | 4/13/2005 | 4/13/2005 | P | PART |
Jack Frank
|
|
|
called needs to update permit for wiring of spray booth and oven original permit was for 480 volt p/s only double fee due for new portion of work
|
Final | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 11:33:07 AM. Contact: ###-####. all corrections not made 4/6/2005 2:59:12 PM
|
Conference | 3/24/2005 | 3/25/2005 | 3/25/2005 | A | DONE |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/24/2005 at 10:03:54 AM. Contact: ###-####. cor. posted met contractor 210.5(C), 200.6(D), 225.37, 314.28(A)(2), 250.52(A)(1),58,104(A)(1), 110.2,3 spray booth and furnace not listed or tested 3/25/2005 9:52:33 AM
|
Final | 3/23/2005 | 3/24/2005 | 3/24/2005 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/23/2005 at 10:43:29 AM. Contact: ###-####. never had reinspection for trench , need to meet with contractor , spray booth not listed? called left message 3/24/2005 9:18:33 AM
|
Electrical Rough-In | 2/28/2005 | 3/1/2005 | 3/1/2005 | A | FAIL |
Pat Lass
|
|
|
trench inspection please///doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
300.5 18in cover.
110.3 bend in coupling half way down the run. 3/1/2005 10:08:01 AM
|
Permanent Service | 2/15/2005 | 2/15/2005 | 2/15/2005 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 8:33:02 AM. Contact: ###-####. p/s o/h new ok 2/15/2005 1:02:36 PM
|
Conference | 2/1/2005 | 2/1/2005 | 2/1/2005 | P | DONE |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 8:59:17 AM. Contact: ###-####. ok see added p/s 2/1/2005 1:06:27 PM
|
Permanent Service | 2/1/2005 | 2/1/2005 | 2/1/2005 | P | PASS |
Jack Frank
|
|
|
p/s o/h new ok
|
Conference | 1/28/2005 | 1/31/2005 | 1/31/2005 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/28/2005 at 1:54:54 PM. Contact: ###-####. contractor will reschedule called 1/31/2005 11:49:47 AM
|
Permanent Service | 1/28/2005 | 1/28/2005 | 1/28/2005 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 1/28/2005 at 8:55:55 AM. Contact: ###-####. t/w doug he make appointment with 315 for conf. regarding service 1/28/2005 4:40:02 PM
|